Product Quantity
compacted crushed stone 15 cm 148.4 m3
concrete C12/15 424.4 mc
concrete C25/30 708.1 mc
formwork 2664.8 m2
concrete reinforcement S500c 46159.8 kg
concrete reinforcement SPPB Ø5/100/100 3689.9
wood 15x15cm 562 m
wood 10x20cm 1878.5 m
wood 2.5x15cm 494 m
astereala (h= 25mm) 1663.8 m2
exterior masonry 10 cm 101.2 mc
interior masonry 15 cm 210.6 mc
mineral wool for walls, roof 15 cm 1800 m2
exterior painting masonry 1352 m2
apparent bricks 141 m2
extruded polystyrene 5 cm 1410 m2
Product Quantity
extruded polystyrene 3 cm 1100 m2
screed 8 cm 1035.3 m2
screed 3 cm 1035.3 m2
epoxy painting masonry and concrete elements interior 7260 m2
epoxy painting floor 1035.3 m2
folded sheet roof 1848 m2
plaster board fire resistant 30 min 18mm 1524 m2
washable paint 1352 m2
roof windows UV screen 56
kennel doors 80/210 cm 86
exterior kennel doors 90/210 cm 86
other spaces doors 24
fire proof entrance double doors 150/210 cm 8
main access double doors 150/210 cm 2
trench drains dog spaces 100 cm 94
trench drains drain corridors 109 ml

List of materials for recycling zone

Product Quantity
Pane - IPE 140
Beams and columns - HEA 160
Roof braces Ø16, Vertical braces - L 50x5 Total amount of steel: 2520 kg
Secondary closing structure for sandwich panels perimeter walls: Pipe 80x40x4 720 kg
Bolt housings 40 kg

List of materials for technical room

Product Quantity
Compacted crushed stone backfill (20cm) 6.0 m³
Extruded polystyrene (5cm) (underneath the floor planking) 33.0 m²
PVC foil (underneath the floor planking) 35.4 m²
Levelling concrete C8/10 0.6 m³
Simple concrete C12/15 4.8 m³
C25/30 reinforced concrete (support beams) 4.9 m³
Formwork (support beams) 40.7 m²
S500c reinforcement (support beams) 260.0 kg
C25/30 reinforced concrete (floor planking) 3.5 m³
S500c reinforcement (floor planking – jacks +rebars) 90.0 kg
SPPB Ø5/100/100 reinforcement (floor planking) 43.0 m²
C25/30 reinforced concrete (pillars) 1.6 m³
Formwork (pillars) 20.9 m²
S500c reinforcement (pillars) 460.0 kg
C25/30 reinforced concrete 2.8 m³
Formwork 28.4 m²
S500c reinforcement 337.5 kg
C25/30 reinforced concrete 4.1 m³
Formwork 32.8 m²
S500c reinforcement 491.4 kg
8x15cm timber 75.6 m
15x15cm props and wedges 11.8 m
15x15cm sill 24.0 m
Revetment (h= 18mm) 46.1 m²